advertise your local business here »Good Monday Morning. This weeks list of road closures is long! Please note if a project is not listed. The NCDOT either has not provided information or the project is not scheduled to be completed in 2017
|
China Grove |
Start Time |
|
6/24/2017 12:00 AM |
|
|
End Time |
|
|
6/24/2017 06:00 AM |
Lane Construction will be closing northbound I 85 between exits #63 (Lane St.) and #68 (China Grove / U S 29/ N C 152) to install the bridge beams on the new Lentz Road bridge over I 85.
|
Near China Grove |
Start Time |
|
6/20/2016 09:00 PM |
|
|
End Time |
|
|
6/30/2019 05:00 PM |
Construction of four additional travel lanes (two in each direction) to approximately 5 miles of I-85 from north of Lane Street (Exit 63) to north of NC152 (Exit 68) in Rowan County. Interchange improvements are also planned for interchanges at NC152 (MM 68) and Old Beatty Ford (MM 65). Bridges between Lane Street and NC 152 will also be replaced for I-85 expansion.
This project will complete the expansion of I-85 through Rowan County, providing a greater level of service for local and through traffic. The Contractor will need to have nightly lane closures along I-85 for construction of the I-85 widening project . Closures can take place in the inside or in the outside lanes. Closures could be located on North Bound or South Bound of I-85.
|
Near Salisbury |
Start Time |
|
6/12/2017 11:00 AM |
|
|
End Time |
|
|
6/12/2017 12:00 PM |
The shoulder will be closed near Exit 72 (Peach Orchard Road) for DMS maintenance.
|
Near Salisbury |
Start Time |
|
6/12/2017 12:30 PM |
|
|
End Time |
|
|
6/12/2017 01:30 PM |
The right lane will be closed one mile north of Exit 72 (US-52/Innes St) due to DMS maintenance.
|
Near Salisbury |
Start Time |
|
6/12/2017 02:30 PM |
|
|
End Time |
|
|
6/12/2017 03:30 PM |
|
The right lane will be closed 2 miles north of Exit 76 (Innes Street) for DMS maintenance.
|
North of Spencer |
Start Time |
|
6/12/2017 01:30 PM |
|
|
End Time |
|
|
6/12/2017 02:30 PM |
|
The shoulder will be closed one mile north of Exit 84 (NC-150/Tributary Way) for DMS maintenance.
|
Salisbury |
Start Time |
|
6/1/2017 07:00 AM |
|
|
End Time |
|
|
6/30/2017 05:00 PM |
Concrete islands being poured to eliminate left turns from Morlan Park Rd onto Jake Alexander Blvd to improve saftey.
|
Landis |
Start Time |
|
10/27/2016 10:00 AM |
|
|
End Time |
|
|
10/27/2017 10:00 AM |
The Mill St. railroad crossing will close permanently between Main St. and Central Ave.
|
China Grove |
Start Time |
|
6/19/2017 06:00 AM |
|
|
End Time |
|
|
6/19/2017 09:00 PM |
The Contractor will be making improvements to the railroad crossing on Centerview Ave. in China Grove between Main St. and Bostain St.
|
Near China Grove |
Start Time |
|
5/10/2017 08:00 AM |
|
|
End Time |
|
|
6/16/2017 06:00 PM |
Road Closed to reconstruction intersection China Grove Rd and A new Alignment Old Beatty Ford Road.
|
Near China Grove |
Start Time |
|
1/21/2017 06:00 AM |
|
|
End Time |
|
|
8/9/2017 05:00 PM |
|
The Daugherty Road bridge over I-85 is being replaced as part of the I-85 widening project.
|
Landis |
Start Time |
|
8/5/2016 09:00 AM |
|
|
End Time |
|
|
8/5/2017 09:00 AM |
The Contractor will be PERMANENTLY closing the railroad crossing on North Central Ave. in Landis between N. Main St and E. Taylor St.
|
China Grove |
Start Time |
|
11/1/2016 09:00 AM |
|
|
End Time |
|
|
11/1/2017 09:00 AM |
The Thom St. railroad crossing will close permanently between Main St and Lillian St.
|
China Grove |
Start Time |
|
2/13/2017 06:00 AM |
|
|
End Time |
|
|
9/1/2017 05:00 PM |
|
The Lentz Road bridge over I 85 is being replaced as part of the I 85 widening project.
|
Rowan CountySR-1986 (Mt Vernon Rd), Both Directions |
Start Time |
|
3/13/2017 08:00 AM |
|
|
End Time |
|
|
10/31/2017 11:00 PM |
|
Road Closed to replace the existing bridge to tripple box culvert.
|
North East of Rockwell |
Start Time |
|
11/18/2014 11:48 AM |
|
|
End Time |
|
|
12/31/2017 12:48 PM |
The causeway of St. Matthews Church Road across High Rock Lake is closed to two way traffic and commercial vehicles.
|
South of Granite Quarry |
Start Time |
|
7/15/2016 08:00 AM |
|
|
End Time |
|
|
7/15/2017 08:00 AM |
Construction for PERMANENT Closure of Gold Knob Rd. Intersection Safety Improvements.
|
South of Salisbury |
Start Time |
|
6/19/2017 07:00 AM |
|
|
End Time |
|
|
10/2/2017 05:00 PM |
Shive Road will be temporarily closed at the bridge over Second Creek (near the Organ Church Road intersection), as crews work to replace the bridge at this location.
|
South of Salisbury |
Start Time |
|
6/15/2017 07:00 AM |
|
|
End Time |
|
|
6/22/2017 05:00 PM |
|
Road will be closed